Portfolio Tag: new house

Schultz – 2016

Schultz - Parklands - 2016 The client's geyser had blown causing water-based damage to the ceilings and surrounding area. This included the walls, paintwork, light fitting, skirting boards and cornices. All the existing ceiling boards and cornices were removed and discarded of and the walls scraped and prepped for new paint. Once the new boards…
Read more

Maple Mews – Unit 17

Maple Mews - Unit 17 Laminated flooring boards were damaged due to water damage from the roof. We needed to remove the existing carpet and place down new laminated flooring boards. First the skirting boards needed to be removed and then the carpet. Once this was done the flooring's underlay was placed onto the sceeded…
Read more

Maple Mews – Unit 19

Maple Mews - Unit 19 Matching the new with the old This job entailed the repairs to a damaged ceiling as well as laminated flooring caused by a flood of water from the building's roof. We removed the existing ceiling boards as well as the existing damaged laminated flooring boards. [caption id="attachment_4204" align="aligncenter" width="1328"] The…
Read more

Project Enock

RESTORATION PROJECT ENOCK: 2011 EERSTE RIVER Restoration Project: Insurance claim for the repairs and restoring of a home severely damaged by vandalism and theft.  Ceilings, rafters, sanitary ware, hot water cylinder, windows and doors were replaced. Plaster-work inside and out and the addition of plaster bands to windows and a complete paint throughout resulted in a…
Read more

Project Pospech

PROJECT POSPECH: 2012 MEADOWRIDGE Construction Project: Add upper floor with bedrooms and bathrooms and upper external entertainment deck, wired for light and sound and situated surrounded by the steeply sloping roof and overlooking the ground floor patio/braai and pool area. The entire lower floor was revamped with original bar room, kitchen and lounge re-located. The original…
Read more

Project Miller

PROJECT MILLER: 2013 CONSTANTIA (PHASE 1) Project: Plumbing and drainage installation included and allowed for a grey water reticulation system. [spacer] [caption id="attachment_2314" align="aligncenter" width="1080"] Trenches are dug to cast concrete for foundations at Project Miller.[/caption] [spacer] [caption id="attachment_2313" align="aligncenter" width="1080"] Soak-away system built at Project Miller site.[/caption] [spacer] [caption id="attachment_2331" align="aligncenter" width="1152"] In-situ formwork…
Read more